Thread: DR Plan
View Single Post

   
  #1 (permalink)  
Old 01-05-2008, 10:59 AM
madunix
 
Posts: n/a
Default DR Plan

Disaster Recovery (DR)Preparation

We do Oracle10g CRS (no _HACMP_) on 2xNodes AIX5.3 connected to FC SAN
DS4800 to serve our members which is a real time application.we
planning to do a Disster Recovery plan for this service,DR plan need to
recover 1 hour max time, the site will be about 35Km away,system must
be restored to the last transaction, on the backup site we are thinking
to palce the same identical hardware of our Production, AIX Servers and
SAN DS4800Our data will be mirrored across a WAN link E1.

Is there anyone that have some experience of Veritas, TSM or STORIX for
DR.


madunix

Reply With Quote